Trueblue

Showing posts with label kitchen. Show all posts
Showing posts with label kitchen. Show all posts

Thursday, July 13, 2017

Easy Kitchen Update

Although we have a few projects in the cue right now, we don't have any current before or afters to show.  I thought we would do a throwback to our Ferndale kitchen, where we updated the space on a budget.  We were not as ambitious as we were in our current house; we wanted to keep the footprint of the kitchen, and the cabinets were still in good shape. Caution: these photos were not taken on a fancy camera, so they are quite blurry.





The first thing we did was take off all of the doors and drawers and sand them.  I do not have pictures of the process, but just imagine a lot of dust and sweat.  We then painted each door, drawer, and the cabinet boxes a bright white.  We made sure to use a good quality paint that would stand up to the wear and tear of a kitchen.  



The counters were a pale pink color- it looked like a ice cream shoppe.  We decided to invest some money in a black granite countertop.  We found a local granite guy that gave us a pretty good deal, all we had to do was demo the countertop ourselves!
  
He's so strong!



We ordered an undermount sink from the granite guy, so they installed the sink for us when they installed the countertops.  

Next up: updating the backsplash.  I had never installed a backsplash before, but I was pretty sure that between Jeff, myself, YouTube, and our incessant watching of HGTV, we could figure it out.  We went with a simple subway tile that came on a sheet.  This made it so much easier to install!  We were a little burned out on projects at this time, so we made a pact.  Every night we would work on the backsplash after dinner until 9 o'clock.  This way we could break up the project into smaller chunks, but we could still relax in the evening.  It took a little longer than installing tile should have, but it saved our sanity.  


You may be looking at that tile on the right and think, "Hey, that tile looks pink."  Well, it was.  Next to our stove was the chimney, which was covered with a light pink tile.  I seriously wanted ice cream every time I waked into that kitchen!  Jeff was able to look at the brick from the other side of the chimney, and it was not cute. Where cute, rustic 1920s brick should be, was ugly gray cinder block.  Wah, wah....We ultimately decided to paint over the tile.  Technically, you can't paint over tile, because it will just scratch off or rub off when you try to clean it.  We found this cool product by Rust-oleum that allows for latex paint to adhere to tile.  Now, all the tile color matches!  


The last thing to change was the mint green paint.  After a few coats of gray paint, our kitchen renovation was complete!  What do you think? 

Before: 

And after: 

Monday, February 20, 2017

Final Kitchen Reveal!

It's only been 10 months since our last update on the kitchen, but that's what happens when you procrastinate actually finishing a project 100%.  In last update on our kitchen remodel, our kitchen still needed a back splash and the doorway moldings finished.



While we were at it, we decided that the little nook that used to have a booth needed to be demoed and turned into a mudroom, complete with new drywall, lighting, a door, and a deck.  Nothing too strenuous.
Good-bye nook!


I was able to crank out the backsplash in a few hours on a cold, Michigan weekend.  The dark gray subway tile added some much needed color to our stark white kitchen.  It also tied into the dark gray flecks in the granite countertops.

On the other hand, the mudroom needed a lot of work, some of which we couldn't do ourselves.  The old area used to have a window that looked out into the yard.  We wanted to install a door there for easier access to the backyard, shed, and driveway.  Neither Jeff nor I knew how to install an exterior door, so we hired out a local contractor, who also happens to be our friend, to install the door.  With his expertise, he installed the door in less than a day and we had a door...to nowhere.  I don't have any pictures showing the process, whoops.

We had planned to attach a deck to our house for entertaining, grilling, and chilling.  This was also out of our wheelhouse, so we hired a local deck guy to build our deck for us.

Now we have a back door and extra space to entertain in the summer!

Looking into the new mudroom.

Walking into the mudroom from outside.


With some artwork, a bench, and a few found treasures,  our kitchen is now complete.

Look at these cute prints we found to rep our hometowns...so cute!


Now for the gallery of photos!







Just for fun, here's the before and after:



If you are interested in seeing the first part of this process, check it out here.  Happy Monday!

Saturday, April 9, 2016

This is the project that never ends...yes it goes on and on my friend.

As we continue our never-ending project of renovating the kitchen, we have some progress to show!  The last time we checked in, we didn't even have drywall up, so this will look pretty impressive. Please shower us with compliments.

It was now time for us to install our drywall.  We had installed drywall once before in our bathroom project, so we had some experience on what we needed to do.  Little tip: pay the extra money to have the hardware store deliver your drywall if you don't have a truck.  It was such a time-saver to have all of the drywall brought to us, instead of shoving it into a too small Jeep while it snowed.

Jeff insulated the exterior wall.  This was a surprisingly easy step.  You just staple the insulation to the top of the studs, roll it down, and cut it.  The entire process took about an hour.



Once that was done, it was time to put the drywall on the ceiling.  (I helped out tremendously by repeatedly singing, "we got drywall on the ceiling" to the tune of "Dancing on the Ceiling" by Lionel Richie.)  We hooked the drywall up to this fancy drywall contraption lift and rolled it on up to the ceiling.

This proved to be a pain in the neck because we have recessed lights in the ceiling- which you need to cut a hole for.  But, if you don't measure and cut a hole before, then how do you know where the light is?  This conundrum stumped us for awhile, and we decided to just try measuring from the edges of the wall to the center of the light and cut a circle.  We used a drywall circle cutter to cut the hole. Wellllll, we didn't measure exactly right, so Jeff had to hack away at the drywall to get the exact circle we needed.  Thankfully, the recessed light covers shield the mistakes!  After the first piece was installed, we moved onto the remainder of the ceiling with minimal problems. (except the time Jeff accidentally left his tools on top of the drywall in the ceiling and almost forgot them up there)  After the stress of installing the ceiling, the walls were a piece of cake.  While Jeff installed, I followed behind him taping and mudding the seams of the walls.



At this point, we had to pause on walls until our electric was all finished. Since we were down a day while our electrician worked, we decided to sand and stain our floors.  Why not? We've done it before, so it should be easier this time. We rented two sanders, an orbital and a drum sander.  I personally like the drum sander better, I think it does a faster job than the orbital, but the orbital is cool because you can sand just like a regular palm sander.  Look at the beautiful pine floors we found under the linoleum!


Here are the floors after a coat of stain:

Once the floors and electric were finished, we tackled installing the cabinets.  This was not as easy as I thought it would be, because I had to be the brace to hold up the upper cabinets.  In a professional world, you would install a brace to make sure the cabinets are level, which also provides a resting area for the cabinets while you screw them into the stud.  Well, we were much smarter than that. I channeled my inner hulk while I silently yelled curse words and held the cabinet up from beneath.  We installed the corner uppers and then moved onto placing the lowers so we could install the pantry. When the pantry was installed, we realized that the pantry does NOT reach the ceiling like we previously thought.  

This was a problem because the uppers we had already installed were all the way to the ceiling.  So, down they came and we had to measure and level them all over again. 
Now the gap is even!
Once the cabinets were installed, everything seemed like it was on fast forward. I didn't take any pictures because time passed so quickly.  We primed and painted the walls, installed the appliances, and added base moldings and moldings to the top of the cabinets.  Jeff installed pendant lights over the peninsula, and the granite counter tops FINALLY arrived.



We've been able to cross off several items from our to-do list and we can see the finish line.  Hopefully within the next week I will have a finished/ decorated kitchen update!

Just for comparison's sake, here's a before and after, with a sneak peek of what we are working on this weekend:


  


Kitchen to-do list:
  • Demo kitchen
  • Design kitchen
  • Run electrical
  • Buy light fixtures
  • Move water
  • Add gas line
  • Build half-wall separating mudroom
  • Buy appliances
  • Install drywall
  • Prime and paint walls
  • Sand and stain floors
  • Install cabinets
  • Install new appliances
  • Trim work 
  • Buy new door to bathroom
  • Buy and install new backsplash
  • Measure and install countertops

Sunday, January 31, 2016

New house- The Little House that Could!

It's been awhile since we've posted anything, mainly because...we bought a new house!  About six months ago, we made a move from the east side of the state to the west side, and have been scrambling to find a home.  We knew we wanted a house that would let us test our DIY chops on a kitchen reno.  After many house tours, we settled on a cute 3 bedroom, 2 bath in the Fulton Heights neighborhood.  The house was previously a rental home, and it was rough!  The moldings were beat up, the floors were all scratched, and oooo-weee is the kitchen pretty.  But through all of the mess and clutter, the house had original hardwood floors, original moldings, and a lot of charm.

We decided that our first project to tackle would be the kitchen. Here is a little video of the before:

*for some reason this only plays in Internet Explorer.  

Similar to our last home, as soon as the ink dried on our mortgage papers, we headed over to the house for demo.  After an hour of intense work, here is what she looked like:

First, we had to take out each of the cabinets. Next, came the ridiculous faux brick paneling.  Behind the paneling was plaster and then a layer of lath that all had to come down.  We were ripping this kitchen down to the studs.  

We wanted to open up our kitchen, so we decided to knock down half of the wall that separates the dining room and kitchen.  This will now become a peninsula with our sink and dishwasher.  (Yes, we did have a contractor tell us if it was load-bearing or not.)
Once the walls and ceiling were demo'd, up came the floor.  I was crossing my fingers for some original hardwood- and I got it!  This is what was underneath 4 layers of linoleum:
We tried several methods of removing this glue/ paper combo, but the only thing that worked was super hot water and Murphy's Oil Soap.  

The glue became a really nasty sludge, which we had to shovel into the trash.  Here's what it looked like after three days of demo:
Already.so.much.better.


We haven't been able to make much progress since we've been waiting a lot on our electrician and drunk plumber.  Jeff was able to make a half wall to block off the former "nook" area, as well as drywall the left side wall, which doesn't have electrical. 


As I said before, we are doing a little rearranging of the layout with this kitchen.  The wall that used to separate the kitchen from the dining room has now become a peninsula, which will have a bar top built into it.  The water had to be moved from over by the window to our new sink area.  We also switched from an electric stove to a gas stove. We had a professional do that part for us so we don't blow up our new house.  The nook area will eventually have a door to the outside installed in it, so it will become a mudroom.  We bought our cabinets from Home Depot because they had the best deal and the style we wanted.  We decided that since we lost some of our cabinetry with removing part of the dining room wall, that we would order cabinets that go all the way to the ceiling.  Not only will our kitchen appear taller, but now we have more storage than before!  
Mock up of the kitchen from the peninsula corner. 

Mock up of the peninsula while standing at the window.  

We should have some more progress after this next week, so stay tuned.  Cabinets arrive next week! 

Kitchen to-do list:
  • Demo kitchen
  • Design kitchen
  • Run electrical
  • Buy light fixtures
  • Move water
  • Add gas line
  • Build half-wall separating mudroom
  • Buy appliances
  • Install drywall
  • Prime and paint walls
  • Sand and stain floors
  • Install cabinets
  • Install new appliances
  • Trim work 
  • Buy new door to bathroom
  • Buy and install new backsplash
  • Measure and install countertops